CASE STUDIES
Howard Industries
PROJECT
DETAILS
PROJECT NAME: Howard Industries
Contractor: Larry J. Sumrall
TYPE: 400,000 sf pre-engineered building
LOCATION: Quitman, MS
INTERESTING FACT: This project was built on an aggresive schedule and had an extensive roof system utilizing more than 100 large curbs, provided by Roof Curb Systems, and 50 wall penetrations. The building had liner panels in walls and roof.
Poarch Creek
PROJECT
DETAILS
PROJECT NAME: PCI POW WOW Grounds building
CONTRACTOR: TripTek Construction
TYPE: Unique Pre-Engineered structure furnished by AL steel in Montgomery, AL
LOCATION: Atmore, AL
INTERESTING FACT: The building was designed with a large compression ring and multiple hip sections that made it a very unique project for all the teams involved. To make the building available for the cultural event on Thanksgiving day, crews worked seven days a week for eight weeks to meet the deadline.
Core Industrial
PROJECT
DETAILS
PROJECT NAME: Core Industrial
TYPE: 25,000 sq. ft. fabrication warehouse for heavy industrial fabrication and repairs
LOCATION: Creola, AL
INTERESTING FACT: Building was fabricated and supplied by Ideal Steel and utilized two 20-ton overhead cranes to handle Core’s demands on heavy tandem lifts.
Southern Wood
PROJECT
DETAILS
PROJECT NAME: Southern Wood
TYPE: 250,000 sq. ft. modular
LOCATION: Irvington, AL
INTERESTING FACT: Used a 300-foot wide modular pre-engineered building by Ludwig Building systems with a “PBR” 24ga roof system. In order to save time on such a tight schedule, the building was erected in large sections.
SOUTHERN TIRE
PROJECT
DETAILS
PROJECT NAME: Southern Tire
TYPE: 30,000 sq. ft. distribution facility
LOCATION: Mobile, AL
INTERESTING FACT: Designed using a pre-engineered single slope building with multiple eave height changes. Roof panel utilized for the project was the Double-Lok standing seam panel with a R-30 simple saver insulation system.
Merchants transfer
PROJECT
DETAILS
PROJECT NAME: Merchants Transfer
TYPE: 400,000 sq. ftg pre-engineered building
LOCATION: Mobile, AL
INTERESTING FACT: Large logistics warehousing facility for general contractor Rogers & Willard out of Mobile, AL.
Hyundai
PROJECT
DETAILS
PROJECT NAME: Hyundai
TYPE: 150,000 sq. Ft. pre-engineered building
LOCATION: Montgomery, AL
INTERESTING FACT: Building for a major car part supplier, built adjacent to massive Hyundai plant in Montgomery, for general contractor Marshall Design-Build
MOSLEY BUILDING SYSTEMS